Skip to content
New: see your fit and get a tailored quote in minutes.Try the estimator
Menu

Deliver · Operate · Govern

Deploy more often. Prove every release was controlled.

When your release process depends on manual approvals, tribal knowledge, and spreadsheet evidence, speed and safety compete. IntegraCI orchestrates your existing CI/CD and GitOps tools around policy-as-code deploy gates, deployment windows, and real-time DORA metrics so your team can increase deploy frequency without increasing risk. Every gate decision is recorded in a tamper-evident audit trail the moment it happens, so the proof that a release was controlled exists before an auditor ever asks. GitOps-driven progressive rollouts make each deploy a routine operation, not a high-stakes event. You get faster delivery and the evidence to show it was done right.

Who this is for

Engineering Manager
Wants to increase deploy frequency without burning trust with security or compliance teams.
Platform Engineer
Wants standard, enforced delivery patterns so every team ships safely without a separate review process for each release.
Head of Compliance / CISO
Wants evidence that every production change was reviewed, gated, and logged without chasing engineers for it after the fact.

The problem

Why speed and control keep colliding

Most teams are not slow because of their engineers. They are slow because the controls around delivery were designed for a world where deploys were rare and risky, and those controls have not changed.

  • Gates slow you down but do not actually protect you

    Every release waits for a human to approve a checklist nobody has time to read carefully. The slowdown is real; the protection is not. A scan that passed two days ago and an untested deployment window tell you nothing reliable about the release in front of you.

  • Velocity metrics come from surveys, not systems

    Lead time and deployment frequency reported from spreadsheets or Slack polls reflect what people remember, not what actually happened. You cannot improve a number you cannot measure reliably, and you cannot trust a trend built on estimates.

  • Every push to go faster earns a push back from security

    When compliance controls live outside the delivery pipeline, the only way to satisfy them is to slow the pipeline down. Teams learn to route around controls, and auditors learn not to trust the logs. Speed and safety become a negotiation instead of a design.

How it works

How IntegraCI does the job

IntegraCI connects to your existing delivery tools and adds a governed layer: policy-as-code gates, deployment windows, real DORA data from actual events, and a tamper-evident log that documents every decision as it happens.

  • Policy-as-code deploy gates that run automatically

    Before any release artifact reaches a production target, IntegraCI evaluates it against your gate rules: scan results, test coverage, change-window status, and signed provenance in one consistent pass. A release that does not meet policy is blocked, not just flagged, and the block reason is written to the audit log immediately.

  • DORA metrics computed from real delivery events

    Deployment frequency, lead time, change failure rate, and mean time to restore are computed from the actual events your pipelines, incident tools, and version control systems already emit. No surveys. No manual entry. The dashboard shows what is genuinely happening so you can act on real trends.

  • GitOps-driven progressive rollouts by default

    Changes flow through version-controlled promotion stages managed by your existing GitOps controller. IntegraCI generates canary or blue-green configurations, monitors each stage against your SLOs, and either promotes automatically when health checks pass or holds for a human approval decision before going further.

  • A tamper-evident record of every release decision

    Every gate evaluation, human approval, promotion, and rollback event is written once to an append-only, tamper-evident audit log the moment it happens. At audit time you export a structured evidence bundle. Nothing is reconstructed after the fact, because the record was built during delivery.

payments-api - deployment pipeline gated
  • Test suite 847 tests passed, 0 failures, coverage threshold met
  • Policy gate All 6 rules satisfied, signed provenance verified
  • Change window Deployment window opens at 14:00 UTC, release held
  • Canary rollout 5% traffic, monitoring SLOs for 15 minutes
  • Promotion decision Awaiting human approval to promote to 100%
  • Audit record All gate decisions logged, evidence bundle ready for export

Every release follows the same gated path. The audit record is written before the deploy completes, not assembled afterward.

What you experience

What your team experiences day to day

Once gates are enforced automatically and rollouts are progressive, the daily rhythm of delivery changes in concrete, visible ways for every role involved.

  • Developers get a clear decision, not a waiting room

    When a release candidate is ready, the platform evaluates every policy rule and returns a pass or a block with a specific reason. Developers know exactly what to fix, not just that something is wrong, and they can re-run the gate check without opening a ticket or pinging a reviewer.

  • Operations runs deploys without fire drills

    Canary stages, health checks, and automatic SLO comparison replace the manual 'watch the dashboards' ritual that precedes every release. A rollout that starts to degrade either pauses for a human decision or rolls back according to the rules your team set in advance.

  • Compliance has evidence before they ask for it

    Gate decisions, approval records, and deployment events are structured and searchable from the moment they happen. When an auditor requests evidence of controlled change management, you export it. You do not reconstruct it from memory, Slack history, or email threads.

Outcomes

What changes for the business

  • Higher deploy frequency with fewer incidents

    When gates are enforced automatically and each release starts small, teams push more often because each push carries less risk. Fewer things reach production with known defects, and the ones that slip through are caught at the canary stage before they affect all users.

  • Reliable DORA data that drives real decisions

    Engineering leadership can see whether process changes are improving or hurting delivery performance, measured from the systems rather than from memory. Quarterly planning conversations start from a shared baseline instead of competing anecdotes.

  • Audit evidence that holds up under scrutiny

    Every controlled-change requirement maps to a specific log entry generated during delivery. Compliance reviews stop being multi-week fire drills because the structured evidence bundle was assembled automatically while your team was shipping.

The proof

Mechanisms you can point at, not adjectives.

The claim holds because of how it is built. Each control runs in the path, records what it did, and maps to the framework you report against.

Policy-as-code deploy gate

Before any release artifact is promoted to a production target, IntegraCI evaluates it against your active gate rules stored in version control. A failed rule blocks the promotion at the gate layer and writes a structured denial record, including the specific rule and the failing value, to the tamper-evident audit log. The gate cannot be bypassed without an explicit, logged override approved by an authorized person.

Deployment window enforcement

Release schedules are encoded as policy, not calendar invitations. A promotion attempted outside an approved window is held or blocked at the gate layer, not just warned about. The window check result and its timestamp are part of every audit record, so the evidence shows not only what was deployed but when and whether the timing was authorized.

Append-only delivery audit log

Every gate evaluation, human approval, promotion, and rollback event is written once to an append-only, tamper-evident log. Records cannot be edited or deleted after the fact. The log is generated during delivery, structured for machine readability, and exportable as a complete evidence bundle covering a single release or a full audit period.

Maps to

  • SOC 2
  • ISO 27001
  • NIST SSDF
  • CIS Controls

The platform maps your controls to these frameworks. The mapping helps you demonstrate them; it is not a certification.

The artifact is the proof

Deployment evidence bundle

An exportable, structured record covering every gate decision, human approval, window check, and deployment event for a release, ready to attach to a change ticket or hand directly to an auditor.

Questions, answered.

Does IntegraCI replace my CI/CD pipeline?

No. IntegraCI orchestrates and gates the pipeline tools you already run. Your existing CI runners, artifact registries, deployment controllers, and GitOps agents stay in place. IntegraCI adds the policy evaluation and audit layer on top of them so your team keeps the tools they know.

Which delivery tools does the gate layer work with?

IntegraCI connects to major CI platforms, container registries, and GitOps controllers through its connector catalog. Gate rules consume the events and artifacts those tools already produce: test results, scan reports, deployment events. If your tool emits a result, IntegraCI can evaluate it against your policy.

Who writes and maintains the deploy gate rules?

Platform engineers or security leads write rules in policy as code, stored in version control alongside your other infrastructure definitions. Rules are reviewed, tested in a dry-run mode, and promoted like any other code change. Non-technical stakeholders can read them without needing to understand the underlying syntax.

How does progressive rollout work if we manage our own clusters?

IntegraCI generates rollout configurations for your GitOps controller to apply to your cluster. Your infrastructure stays yours. IntegraCI issues the configuration, monitors the rollout outcome against your SLOs, and presents the human-in-the-loop approval decision inside the platform before any promotion to a wider audience. Nothing changes in your cluster without a configuration commit going through version control.

Faster releases start with gates you can trust

When policy is code, gates run automatically, and every decision is logged the moment it happens, speed and control stop being a trade-off. Book a walkthrough to see how IntegraCI enforces your delivery standards without slowing your teams down.